Project J.2447 Precast Concrete Parts Factory, High-speed Railway connecting three airports (Don Mueang - Suvarnabhumi - U-Tapao)
Cut and Fill: Clearing the original ground, which is a layer of clay (Soft Clay), and filling according to the level value with laterite material, along with compacting the soil layer (Soil Compaction) every 50 cm. with a CBR value of not less than 6%.
Area size 125-1-14.25 rai